Texas Instruments INA-DUAL-2AMP-EVM INA Evaluation Module (EVM)

Texas Instruments INA-DUAL-2AMP-EVM INA Evaluation Module (EVM) is compatible with various dual-channel two-amp instrumentation amplifiers (INAs). This evaluation module is compatible with the SOIC-16 (D) and SOIC-16 (DW) INA packages. The Texas Instruments INA-DUAL-2AMP-EVM is designed to evaluate the performance of the devices in both single-supply and dual-supply configurations.

Features

  • Intuitive evaluation
  • Easy access to nodes with surface-mount test points
  • Reference voltage source flexibility
  • Convenient input and output filtering

Board Layout

Mechanical Drawing - Texas Instruments INA-DUAL-2AMP-EVM INA Evaluation Module (EVM)
Inilathala: 2022-02-15 | Na-update: 2022-03-15